The project related to Iziran company is another project of Abgin Pardaz Sharq in 1401, which was implemented by order of Hamedan Municipality and is a POD container data center or data center with optimal performance. This 8-bay data center is built with utmost attention to the points considered necessary by the employer and the quality standards of Abgin Pardaz Shargh.

Problem

All insurance agencies need appropriate infrastructure to maintain the confidentiality of their insurers, and the high volume of information stored in such companies requires precise metropolitan systems. Therefore, by providing access to insurance to such facilities, the safety of its customers is provided. 

  •  Secure data storage
    Create enough space for metadata
    Unified access for all insurance personnel to all information
    AND…

Project implementation challenges

The construction and management of data centers are always linked to numerous challenges and this project, like other projects, is no exception to this rule. From the first meeting with the employer to the project completion and support process, many challenges arise that require intelligent management. Some of these challenges are:

  • Inconsistency between different departments of organizations.
    Delays in payments from various companies and fluctuations in currency prices.
    Power problems and widespread blackouts in the production site
    Changing the demands and needs of the entrepreneur in the production process

However, Abginepardaz Shargh handles the challenges without delay in building the project and tries to draw ideas from the new methods around the world and eliminate the worries with the best craftsmanship. Therefore, they try different ways to solve these problems and do detailed planning by choosing scientific and practical ways.

The solutions proposed by APS

The challenges that arise in the process of building, relocating and configuring data centers fall into specific categories and can best be managed through planning and the use of technical knowledge and experience.

Project implementation steps

APS Projects with careful planning and calculations of the engineers of this company.

  • 1-جلسات با کارفرما و بررسی نیازها

    2-ارائه پیشنهادات و بررسی آن‌ها توسط کارفرما

    3-بررسی فضا و امکانات کارفرما

    4- شروع پروژه

  • 1-ارائه طراحی مرکز داده و تایید طرح توسط کارفرما

    2-تامین و ساخت قطعات و تجهیزات

    3-نصب تجیزات داخل کانتینر

  • 1-ارائه طراحی مرکز داده و تایید طرح توسط کارفرما

    2-تامین و ساخت قطعات و تجهیزات

    3-نصب تجیزات داخل کانتینر

  • 1-راه‌اندازی و تست اولیه دیتاسنتر

    2-کنترل کیفیت مرکز داده Quality Control

    3-تست فول‌لود Full Load دیتاسنتر

  • 1-بررسی عملکرد صحیح دیتاسنتر

    2-تحویل موقت به کارفرما

    3-تست نهایی پروژه در محل استقرار

  • 1-آموزش به کارفرما

    2-تحویل دائم به کارفرما

    3-اتمام پروژه 

Results of the implementation of the project

The Data Center of the POD series uses a standard marine container and is the first product to have 2 racks in two separate cameras. The design of this project is in line with the customer’s needs and requests and is the first data center designed in Iran based on the design of the Huawei brand data center. The design of the racks inside the enclosure is two-chamber with 4 separate racks with hot air and cold air ports and is different from the usual single line designs. This product is the first to use Vaccum Duct, which is installed in the form of two Speed ​​Ducts behind the data center electrical room above the batteries.

Behzad Borhani /  CEO of APS