Employer : ExportEmployer's field of activity : IT & TechnologyProject size : InternationalEnd time : In ProgressManpower : 25Data center type :Core data center, POD Data CenterLocation :IraqProject status : In Progress

introduction

The Smartbox POD container data center deployment, completed in 1401, is another of East Water Company’s latest projects to build a POD data center with optimal performance. This data center has 20 racks with TIER IV standards and is one of the export data centers that tested the competitive strength of Abgin Pardaz Sharq with foreign competitors such as Shnider and HUAWEI.

Problem

Holding numerous client meetings, the Abgineh Pardaz Sharq team considered a 20-rack container and upgraded the data center standards from TIERII to TIERIV. This data center is the first export project of the POD series. In organizations and businesses around the world, secure information storage and transfer, organizational personnel’s access to data, creating more space for information storage, etc., have always been of great concern and is evaluating the possibility of solving these problems. a great need. To develop its information storage and security infrastructure, Eaz Iran commissioned a data center with optimized performance to achieve the following benefits:

  • More space for organizational data storage
    Increase the organization’s information security.
    Integrated access to information by all members of the organization.
    And…

Project Implementation Challenges

One of these challenges is to surpass international standards and compete with competitors such as HUAWEI and Shnider globally. Data center construction and operation are always associated with numerous challenges, and this project, like other projects, is no exception to this rule. Some of these challenges are:

  • Currency price fluctuations and changes in the parts purchasing process.
    Changes to the customer order during the project.
    The need to be flexible in decision making
    The challenges of traveling and the problems associated with obtaining permission to cross roads
    Organizations’ inconsistencies in the data center relocation process

One of the issues we faced regarding this project was the need to place two sets of racks in the same space and the ability for the technical team to see and work with the racks. The businessman requested that the NOC room be placed in a place where the technical manager could see the shelves. The definition of the average space center to allow the employer to dominate all equipment was one of the problems. The isolation of this data center was also another problem based on IP criteria.

The suggested solutions

The challenges that arise in the process of building, transfer and implementation of data centers are included in some categories and can be better administered through planning and use of technical experiences and knowledge.

Project implementation steps

APS Projects with careful planning and calculations of the engineers of this company.

  • 1-جلسات با کارفرما و بررسی نیازها

    2-ارائه پیشنهادات و بررسی آن‌ها توسط کارفرما

    3-بررسی فضا و امکانات کارفرما

    4- شروع پروژه

  • 1-ارائه طراحی مرکز داده و تایید طرح توسط کارفرما

    2-تامین و ساخت قطعات و تجهیزات

    3-نصب تجیزات داخل کانتینر

  • 1-ارائه طراحی مرکز داده و تایید طرح توسط کارفرما

    2-تامین و ساخت قطعات و تجهیزات

    3-نصب تجیزات داخل کانتینر

  • 1-راه‌اندازی و تست اولیه دیتاسنتر

    2-کنترل کیفیت مرکز داده Quality Control

    3-تست فول‌لود Full Load دیتاسنتر

  • 1-بررسی عملکرد صحیح دیتاسنتر

    2-تحویل موقت به کارفرما

    3-تست نهایی پروژه در محل استقرار

  • 1-آموزش به کارفرما

    2-تحویل دائم به کارفرما

    3-اتمام پروژه 

Results of the implementation of the project

Perhaps the most important result of each project is the creation of a data center in the latest technological methods that meet all the needs of the employer as indicated in the contract. The process is performed with precise tools, such as moles and lasers. The construction of all parts of this project was done with the help of precision tools such as Mollis and lasers and our accuracy in this data center reached +-2mm.

This project is the first container data center in Iran with TIER IV standards and is the first POD (Performance Optimized Data Center) exported by Abgin Pardaz Sharq. This project has a tolerance of +- 2mm and is the first project to be done with precise tools.

Behzad Borhani / CEO of APS

تصاویر پروژه‌ها

One of the most important principles observed in the design and manufacturing process of APS products is the principle of conformity.

Abgineh Pardaz Shargh