Introduction
6 units of 50-foot container data centers with optimal performance, which were completed by order of the country’s fiscal affairs organization and Eaz Iran’s employer in November 1401, is another recent project of Abgineh Pardaz Sharq. This 60-bay POD data center was built based on sophisticated engineering science and experience, and all international and quality standards have been observed.
Problem
Always in organizations and companies around the world, storing and transferring information safe information, access to data on data, creating more space for storing information, etc., have created great concern, and is a great need to address such problems. To develop its information storage and security infrastructure, the Tax Administration commissioned a data center with optimized performance to achieve the following benefits:
- The need for more space to store the organization’s data
Increase the information security of the organization.
Integrated access to information by all members of the organization.
چالش های اجرای پروژه
Each project is unique and presents different challenges depending on the nature and characteristics of the product. The Novin Arin portable data center project, like other projects, in the process of construction and selection of parts, currency fluctuations, data center relocation and relocation, and start-up, brought challenges that were well managed by Abgin Pardaz Shargh engineers.
Lack of sufficient facilities to maintain the data center at the employer’s premises
Failure to deliver the data center on time by the employer
Making changes to the plans due to the unfamiliarity of the employer’s staff
Absence of resident force at the site
Despite these challenges, according to the commitments made to the employer, Abgineh Pardaz Sharq delivered the data center as they wanted and launched it successfully, fully meeting the satisfaction of the group and meeting the priorities of the organization
راهکار های پیشنهادی آبگینه
Without a doubt, challenges cannot be controlled without using experience and the art of management, and this is the one thing that cannot be studied in any scientific book or article. This is exactly the same technique the Sharq Waterworks team uses to address issues on every project.
- Hold many brainstorming meetings with the employer
- Continuous research to find the strength residing in the project site.
- Discussion and consultation
Project Implementation Steps
APS projects progress step by step with detailed planning and calculations by the engineers of this company.
-
1-جلسات با کارفرما و بررسی نیازها
2-ارائه پیشنهادات و بررسی آنها توسط کارفرما
3-بررسی فضا و امکانات کارفرما
4- شروع پروژه
-
1-ارائه طراحی مرکز داده و تایید طرح توسط کارفرما
2-تامین و ساخت قطعات و تجهیزات
3-نصب تجیزات داخل کانتینر
-
1-ارائه طراحی مرکز داده و تایید طرح توسط کارفرما
2-تامین و ساخت قطعات و تجهیزات
3-نصب تجیزات داخل کانتینر
-
1-راهاندازی و تست اولیه دیتاسنتر
2-کنترل کیفیت مرکز داده Quality Control
3-تست فوللود Full Load دیتاسنتر
-
1-بررسی عملکرد صحیح دیتاسنتر
2-تحویل موقت به کارفرما
3-تست نهایی پروژه در محل استقرار
-
1-آموزش به کارفرما
2-تحویل دائم به کارفرما
3-اتمام پروژه
Project implementation results
Although our most important achievement in every project is to maintain customer satisfaction by providing innovative products, the innovative solutions provided by our experts to solve the challenges of this project are definitely a unique achievement. In addition, this project is the first spiral container data center in Iran, designed and launched by Abgin Pardaz Shargh.
- Provide real support services for the products offered
- Promotion and replacement of specialized thinking in the optimal use of consumer facilities and resources.
- Choose the best products with the best price and highest quality
Behzad Borhani / CEO of APS
تصاویر پروژهها
یکی از مهمترین اصولی که در پروسه طراحی و ساخت محصولات آبگینه پرداز شرق رعایت میشوند، اصل رعایت استانداردها است.